– Restore Chiller OperationRapidly with Minimal Downtime

For operation in critical cooling applications such as data centers, hospitals, laboratories and process cooling, reliability of chillers is crucial. However, the capability of chilleron rapid restoration from power failure is in fact, equally or more important. Conventional chillers may take minutes to restart and restore the operation due to limitations on mechanical mechanism. And if the cooling is interrupted too long, critical operations may face the risk of loss millions of dollars in equipment failure and operational downtime.

With Dunham-Bush “Rapid- Recovery” feature, chillersareable to restarts as fast as 10 secondsand loaded up to full loadcapacity as fast as 2.5 minutes, after power supply isrestored.

This“Rapid-Recovery”feature will able to save you both time and money by:

  • Reducing time for chiller restart after power failure
  • Minimize cooling disruption time
  • Rapidly restore chilled-water temperature
  • Maintaining patient comfort in hospital critical area
  • Keeping process equipment cooled
  • Reducing risks of manufacturing downtime
  • Minimized the impact of temperature spike in data centers
  • Providing a faster initial start

Dunham-Bush “Rapid-Recovery” feature is available in:

  • Magnetic Bearing Chiller Series
  • Centrifugal Chiller Series
  • Water-Cooled Screw Chiller Series
  • Air-Cooled Screw Chiller Series

Kindly contact your nearest Dunham-Bush Sales office to learn more about Dunham-Bush Chiller Rapid-Recovery feature.

*Note: Restore time vary depend on chiller series.